A Brief Overview of the New PMBOK - Change Is Inevitablehttps://images.globalknowledge.com/wwwimages/h_pm.jpg

Samuel Brown, PMP, Global Knowledge Instructor

Project Management Institute (PMI) released the latest revision of their Guide to the Project Management Body of Knowledge (PMBOK®) in its fourth edition on December 31, 2008. The Fourth Edition addresses a number of inconsistencies in the naming convention for processes that existed in the Third Edition, reorganizes some process, and "tweaks" the fundamental set of processes such that we end up with a few old processes missing and some new "faces" in the mix. All in all the total number of project management processes in the PMBOK dropped from 44 in the Third Edition to 42 in the Fourth Edition.
The changes in the PMBOK Fourth Edition can be summarized into three general categories; Name Changes, Reorganization, and Clarifications. Let's take a look at the processes that have simply been renamed.
All of the processes in the PMBOK Fourth Edition have been brought into consistent compliance with the "verb + noun" naming convention that was established in the previous edition. Specific names changes include:

Old Process Name New Process NameIntegrated Change ControlPerform Integrated Change ControlClose Project Close Project or PhaseScope DefinitionDefine ScopeScope Verification Verify ScopeScope Control Control ScopeActivity Definition Define ActivitiesActivity Sequencing Sequence ActivitiesActivity Resource EstimatingEstimate Activity ResourcesActivity Duration EstimatingEstimate Activity DurationSchedule DevelopmentDevelop ScheduleSchedule ControlControl ScheduleCost EstimatingEstimate CostsCost BudgetingDetermine BudgetCost ControlControl CostsQuality PlanningPlan QualityHuman Resource PlanningDevelop Human Resource PlanCommunication PlanningPlan CommunicationsInformation DistributionDistribute InformationPerformance ReportingReport PerformanceManage StakeholdersManage Stakeholder ExpectationsRisk Management PlanningPlan Risk ManagementRisk IdentificationIdentify RisksQualitative Risk AnalysisPerform Qualitative Risk AnalysisQuantitative Risk Analysis Perform Quantitative Risk AnalysisRisk Response PlanningPlan Risk ResponsesRisk Monitoring and ControlMonitor and Control Risks

In addition to the process name changes, the following processes have been added, reorganized, or redefined in the PMBOK Fourth Edition.

Process Name
Change in PMBOK Fourth Edition
Develop Preliminary Scope
Statement Deleted
Plan Scope
Deleted
Collect Requirements
Added to Scope Management
Identify Stakeholders
Added to Communication Management
Procurement Management Processes
Reorganized and redefined
Plan Purchases and Acquisitions
Plan Procurements
Plan Contracting, Request Seller Responses, and Select Sellers
Conduct Procurements
Contract Administration
Administer Procurements
Contract Closure
Close Procurements

Finally, there have been several points of clarification in the PMBOK Fourth Edition in an effort to distinguish various elements within the overall project management framework. Specific attention is given to the differences between the Project Management Plan and the other project management documents. The Project Management Plan is defined as being comprised of the various management plans for each of the fundamental aspects of project management (change, configuration, cost, process improvement, schedule, quality, risk, human resource, requirements, procurement, and scope) and the performance measurement baselines (schedule, scope, and cost).
Additionally, the PMBOK Fourth Edition worked to eliminate some of the redundancy that existed in the prior version of the PMBOK with regard to the distinction between the Project Charter and the Project Scope Statement. The Project Charter elements remained much the same as defined in the PMBOK Third Edition, with focus on defining the project purpose, high-level requirements, high-level project and product descriptions, measurable objectives, and summary milestones and budget. The Project Scope Statement, on the other hand, has been redefined to focus more specifically on the progre

7amasa7
24-03-2009, 20:30
مشكور مستر ياسر

Iraq IT
24-03-2009, 20:53
الجميل انهم طلبوا من كل الاعضاء ان يساهموا في كتابة او تغير المنهج ومهما كان الاقتراح بسيط.

PMI مستقبلها وعملها رائع.

one-zero
25-03-2009, 00:28
تمام يا محمد و من المنهج الثاني للثالث و الان الرابع وانا ملاحظ كل التغييرات منطقية و تطوير الي الافضل
الناس دي لا تمزح و اعترف ان منهج هذة الشهادة يؤثر على السلوك الشخصي ايضا
فالتخطيط لعمل شهادات او الزواج او ......... الخ هي مشاريع ايضا تحتاج ادارة

محمود010
25-03-2009, 00:35
بارك الله فيك

وفعلا فى تغيرات جميلة حدثت فى الاصدار الجديد

ameer_s
25-03-2009, 08:50
تسلم ,,,

Iraq IT
25-03-2009, 09:58
تمام يا محمد و من المنهج الثاني للثالث و الان الرابع وانا ملاحظ كل التغييرات منطقية و تطوير الي الافضل
الناس دي لا تمزح و اعترف ان منهج هذة الشهادة يؤثر على السلوك الشخصي ايضا
فالتخطيط لعمل شهادات او الزواج او ......... الخ هي مشاريع ايضا تحتاج ادارة

ايضا قاموا بوضع امثله كثيرة عن الـ IT يعني المنهج عام ولايمكن القول انه لاختصاص معين.

absba2004
25-03-2009, 11:01
السلام عليكم ورحمة الله وبركاته

شكرا للإخوة الأساتذة على هذا التوضيح المهم, طلبي هل ممكن تفيدونا مشكورين بالنسخة الأخيرة
PMBOK Guide Fourth Edition

ولكم جزيل الشكر

Iraq IT
25-03-2009, 11:22
السلام عليكم ورحمة الله وبركاته

شكرا للإخوة الأساتذة على هذا التوضيح المهم, طلبي هل ممكن تفيدونا مشكورين بالنسخة الأخيرة
PMBOK Guide Fourth Edition

ولكم جزيل الشكر

https://www.amazon.com/Guide-Project-Management-Body-Knowledge/dp/1933890517/ref=pd_bbs_1?ie=UTF8&s=books&qid=1237972832&sr=8-1

Eng.MagoooD
25-03-2009, 15:36
تسلم ياسر ,

هل مواضيع المنهج هي اللي بتتكلم عن : Activity on Node , Activity on Arch , Critical Path , Early& Late Start , Early& Late Finish ?

ولا ده حاجة تانية ؟

one-zero
25-03-2009, 19:13
بالظبط يا ماجد و حاجات تانية كثيرة

Eng.MagoooD
25-03-2009, 22:11
كثيرة ؟

في المتوسط , كم تحتاج وقت للحصول على الشهادة ؟

انا اتذكرت انهم اعطونا في الكلية مادة Project Management , و كانت فعلا مادة لذيذة و ظريفة و كنت حاببها و كمان جبت فيها امتياز .

فلو هي منهجها فعلا قريب من اللي اخذناه , الواحد ممكن يفكر جديا انه ياخذها .

GHOSTEID0
26-03-2009, 00:39
الف شكر يا بشمهندس ياسر

THEMACUBIX
26-03-2009, 09:09
والله يا استاذ ياسر كلامك عن الشهادة اثر بنسبة لي .... لاكن هل لازم اني ادرس ITIL قبل ما اخذ PMP ???

والله يجزيك خير

absba2004
26-03-2009, 09:26
https://www.amazon.com/Guide-Project-Management-Body-Knowledge/dp/1933890517/ref=pd_bbs_1?ie=UTF8&s=books&qid=1237972832&sr=8-1

بورك فيك أخي Iraq IT استطعت ان اتحصل على نسخة الكترونية والحمد لله.

Jordanian_1
26-03-2009, 23:33
والله يا استاذ ياسر كلامك عن الشهادة اثر بنسبة لي .... لاكن هل لازم اني ادرس ITIL قبل ما اخذ PMP ???

والله يجزيك خير
لا ليست متطلب ..


كل الشكر

one-zero
27-03-2009, 03:12
فعلا هذة شهادة و هذة شهادة مختلفة
لو عايز معلومات اكثر عن ال itil عليك بموضوع اخونا محمد العراقي هنا شارح كل حاجة:
https://www.arabhardware.net/forum/showthread.php?t=83372

بالنسبة ل pmp يوجد موضوعين يشرحان القصة بشكل جيد هنا :
https://www.arabhardware.net/forum/showthread.php?t=78453

و

https://www.arabhardware.net/forum/showthread.php?t=100002

one-zero
28-02-2010, 16:22
للرفع

musmfy
03-03-2010, 10:18
كل الشكر للمشاركين ولادارة الموقع

عندي استفسار

للعاملين في ادارة المشاريع
هل الافضل البدء PMP
ام ITIL
ام ليس لهما علاقه مع بعضهما البعض

وشكرا

sisaoking
22-03-2010, 02:47
رائع دكتور ياسر دائما متميز